HomeSitemapContact us
RAGHAV RAMMING MASS LIMITED

 
 
Get Adobe Flash Player
 

Safety Tips

Home • Safety Tips


For the first new lining, the requirements of Silica Ramming Mix is almost 50% of the Furnace Capacity in weight. No need to apply any magnet before heating in our material. Ramming Mix is heated up to 70° C to remove any traces of moisture. Then heated Ramming Mix is allowed to cool down and bonding material or Boric Acid is mixed thoroughly before ramming.

Inspect coil coating after breaking the previous lining. Put Former & Asbestos Mill Board (of proper thickness) properly and start ramming layer by layer. Please see that each and every place is equally rammed. For sintering heat use Super Heavy, Heavy scarp only. The Scarp should be kept up to the Furnace Coil level. Sintering cycle should be done perfectly. Patching Lining, Ramming should be done after removing slag portion completely.





Select Language :   Czech  Danish  Finnish  French    

Home | Company Profile | Products Range | Certifications | Quality | Safety Tips | Our Future Plans | Memberships | Contact Us | Enquiry | Site Map

Products Range Range